Setting Up
Project Site
Packing Up
The monkey bar is being folded down.
The tower is being brought down.
David Whilldin packs up the cores.
Drillers conduct a pipe inventory.
Fran Coloma and Les Wallace paint tables.
Les Wallace sands down a table.
The crew loads the drill rig.
Marshall Pardey sprays down the top drive.
The crew packs the cement tanks in a shipping container
The crew packs the top drive in a shipping container.
David Whilldin packs away the core scanner
The drill rig is ready to leave.
The empty drill site
The drill rig down is halfway down.
HSDP Project Photos
Hawaii Scientific Drilling Project | Project Info | Core Photos | Data | Publications | Project Photos | Acknowledgments